Assembly
Product | DCT250 7-Speed Dry dual clutch transmission |
Introduction of production line: | including gear & shaft sub-assembly line, housing pre-assembly line, DCT pre-assembly line, final assembly, valve body assembly line and testing line. Planned capacity 75JPH, automatic identification and testing system. 11 transmission models can be assembled on this assembly line with 75% automation machines and valve body line cleanliness class 8 (GB50073-2001). |
Product | EDU-Electronic Driven Unit |
Introduction of production line | planned capacity 15JPH, assembly line consisting of differential line, external assembly line and internal assembly line, 50% automation assembly. All press-fit and tightening parameters are monitored, MES system enables traceability of production process and material pull . |